Cliff House Construction Update (concrete pillars, grade beam prep)

The concrete pillars have been in place.

 

The rebars are going to be embedded into the grade beams.

 

The rebar / form work for the grade beams are taken place.


Ranch House Construction Update (concrete driveway completion)

The concrete has been installed.  The concrete is 4,500 PSI, with 10% fly ash content.  (deep broom finish)

 

The expansion joints will be sealed with polyurethane elastomeric sealant.

 

 


Ranch House Construction Update (driveway concrete forms / rebars)

We worked on concrete forms & rebars for a new driveway.  The Fire Department requires a driveway to be accessible with emergency vehicle, thus it shall be able to handle 75,000 lbs.

Besides, we still need to bring in a Super 10 dump truck, etc to deliver materials to the site, so we went with 6″ slab with #4 bars @ 18″ O.C. each way.